A homeowner relocated a gas range without permits, then listed the house. The buyer's inspector flagged unprotected flex line routing and missing makeup air. The sale paused, finishes were opened, a permit was retroactively pulled, and rework doubled costs. One scheduled inspection would have prevented the delay, stress, and expense.
An owner added an egress window with permits, soils report, and inspections. Premiums dropped after documentation, and the appraiser counted a conforming bedroom. The fee stack felt heavy upfront, yet the resale bump and safety upgrade outweighed it, proving how paperwork converts into tangible value far beyond construction day.
During demolition, staining appeared behind tile. An air test, containment setup, and negative pressure equipment added days and dollars, but clearances ensured healthy occupancy and compliant disposal. Because contingency funds were reserved, finishes were preserved, stress remained manageable, and the project still closed on schedule without corner-cutting or regret.